EcoFlow
DELTA 3
- Nominal capacity
- 1,024 Wh Manufacturer source for Nominal capacity (checked 2026-10-04; opens in a new tab)
When to consider another option Loads requiring 240 V or more than the continuous output rating.
Read the fit and limitationsCalculators Backup power planning
Size essential loads first, then estimate battery, solar, and inverter needs.
About 4 minutes You’ll need: essential loads, use hours, and sun assumptions
Solar power calculator for household backup energy planning
Calculations run in this browser; inputs stay out of analytics. A draft saves here after your first change unless you turn saving off. You choose separately whether to save a result to My Household Plan or copy a permitted share link.
Illustrative sizing math
These illustrative rows show how daily essential energy use relates to array watts (using an example 4 peak-sun-hour window and 75% system efficiency) and a 1-day storage target (using an example 20% reserve and 85% conversion efficiency). Actual production depends on season, weather, tilt, shade, and charge-controller voltage/current limits.
| Daily essential load | Illustrative array @ 4 peak sun hours | Illustrative array @ 3 peak sun hours | 1-day battery nameplate estimate |
|---|---|---|---|
| 500 Wh / day | ~167 W array | ~222 W array | ~735 Wh nameplate |
| 1,000 Wh / day | ~333 W array | ~444 W array | ~1,471 Wh nameplate |
| 2,000 Wh / day | ~667 W array | ~889 W array | ~2,941 Wh nameplate |
Start with essential loads and a conservative solar assumption. The result helps frame questions for site-specific production modeling and professional electrical design.
No. It estimates energy capacity and a rough area. A site assessment must account for shade, orientation, setbacks, structure, wind or snow loads, equipment clearances, and local codes.
Storage planning includes the autonomy period and conversion or usable-capacity assumptions. Real performance also varies with temperature, age, discharge limits, and equipment settings.
No. Verify solar production with a tool such as NLR PVWatts, confirm surge loads, and use qualified professionals for final equipment, permitting, and electrical work.
Plan first. Buy what is missing.
Verify solar input voltage, amp limits, and continuous AC output against your array and loads. These documented examples are not selected from your calculator answers.
EcoFlow
When to consider another option Loads requiring 240 V or more than the continuous output rating.
Read the fit and limitationsAnker SOLIX
When to consider another option 240 V loads, needs above the 2,000 W rated AC output, or a plan that depends on additional battery capacity.
Read the fit and limitations